PROJECT DETAILS
LOCATION: Sydney, NSW 2000
CLIENT: City of Sydney
COMMENCEMENT DATE: April 2020
COMPLETED: June 2022
The Sydney Town Hall is a building with exceptional heritage significance, located in the Central Business District of Sydney. The building was constructed in two separate stages with the first stage commencing in 1868 and the second stage being completed in 1890.
The building was set to undergo extensive conservation works and these were split into stages, with the first stage commencing in 2012 and stage two in 2013. HBS Group completed the stage one works and have now been engaged to complete the final stage of the conservation project which will involve a complete restoration of the Sydney Town Hall, preserving it for future generations.
HIGHLIGHTS/SCOPE OF WORKS:
- Scaffolding erected in a staged approach whilst ensuring limited operational and event impact within Sydney Town Hall. All building entrances remained accessible and pedestrians protected from overhead construction at all times.
- Stone repairs and conservation works to the southern, western, clerestory facades and northern stairs. Works consisting of general cleaning of stone work; desalination of salt contaminated sandstone; raking out of pointings, including asbestos containing pointings, from joints in stonework; repointing of joints in sandstone stonework; repair and replacement of deteriorating sandstone with new sandstone as required.
- Repairs and painting of roof decorative ironwork and stormwater drainage.
- Seismic stabilization of parapets and chimneys.
- Inspection of the condition of the external fabric of the dome and its method of installation.
- Reporting on and providing detailed specifications for repairs to the Vestibule Dome.